Mechanical & Power Systems Engineering        

Specialty:  Power Systems Engineering and Mechanical Design                   

 

Thermal Expansion and Contraction Stress Analysis under                                 Bridge Crane 125%  Load Test - 65,000 lbs

Piping Codes ASME B31.1, ASME B31.9 and API 650

 

 

Piping systems are modeled in detail                                  Load test 1.jpg (1505173 bytes)        Load test 2.JPG (1445666 bytes)    Load test 3.JPG (1300448 bytes)

using state-of-the-art Finite Element

analysis.  Design parameters include                                    

gravity loads, thermal expansion and

contraction, dynamics due to flow and                                Design and supervision of 125% load test (65 kips) for bridge crane.

special support systems for seismic                                    

induced loads.                                                                    

 

 

Other services:                                                                    load test 4.JPG (1485528 bytes)        load test 5.JPG (1447615 bytes)

 

Vibration isolation systems, analysis of

dynamic response of systems, and

foundations for rotating equipment.

 

 

 

 

 HannaRanch01.jpg (91224 bytes)Other examples of  piping system

support design (Hanna Ranch Solid

Waste Disposal Plant, Colorado

Springs, CO)

 

 

 

Vibration analysis and evaluation,

Natural Gas Compressor Station

in Wyoming.

 

 

HannaRanch02.jpg (68620 bytes)

vibstudy02.jpg (76523 bytes)

vibstudy01.jpg (62284 bytes)

 

**************************************

 

KingsleyDam.jpg (329415 bytes) 

 

Kingsely Dam Hydro-electric Project:

50 megawatt hydroelectric plant on North

Platt River, Nebraska; Owner: NPPD

 

Responsible for design of mechanical

systems to perform 150 psi hydrotest of 240,000

gallon spiral casing.  Same mechanical system

automatically maintained the spiral casing at 75

psi and provided cooling during 30 day cure of mass

concrete encasement.

mech02.jpg (136332 bytes)Mech01.jpg (204059 bytes)Asme02.jpg (68192 bytes)Asme01.jpg (50218 bytes)