Irrigation & Hydrogeology
Home ] Up ]

 

Home

               

 

        Mapping of irrigation canals, analysis of natural seepage rates, evaluation of impact of canal on local ground water levels,

      construction site dewatering, and evaluaton of impact on permanent structures:  WWT Plant Forensic Investigation, Chalk Creek

 

        FIG01.JPG (360243 bytes)    FIG02.JPG (93347 bytes)    FIG02A.JPG (114933 bytes)

*******************************************************************

        Construction site dewatering well design, excavation design, and special loading conditions: Metro Denver WWTP

        

        Metro WWTP 1.JPG (1492246 bytes)        Metro WWTP 2.JPG (1446887 bytes)        Metro WWTP 3.JPG (1489187 bytes) Dewatering wells.JPG (1432099 bytes)  Dewatering and excavation.JPG (822929 bytes)     Metro WWTP 4.JPG (1389092 bytes)